Меры предосторожности при транспортировке и обслуживании буровых установок для бурения водяных скважин

Во время транспортировки, монтажа, демонтажа и технического обслуживания установки для бурения водяных скважин, safety regulations must be strictly followed to prevent malfunctions.

Precautions for the Transportation of Water Well Drilling Rigs

When moving the water well drilling rig, balance the center of gravity according to road conditions and the site. Random drilling is prohibited at the construction site. Backfilled pits must be marked. When traveling on narrow or dangerous roads, lower the mast and retract the crawler tracks. On sloped terrain, adjust the mast’s tilt angle and lateral inclination. Adjust the rig’s center of gravity by rotating the vehicle. If the access road or construction site is flooded, use the drill bit to guide the machine.

Precautions for the Maintenance of Water Well Drilling Rigs

During the maintenance of water well drilling rigs: cool down the rig beforehand to avoid scalds from high temperatures. Relieve pressure in the hydraulic system prior to maintenance to prevent hazards caused by internal high pressure. Strictly prohibit repairing the main drum’s braking system while the main drum is loaded. When disassembling the right-hand non-rotating steel wire rope and its connection to the hoisting device, beware of mechanical rotation injuries. If the rig’s hoisting device is inflexible, causing live steel wire ropes to twist due to rotational force, avoid pinching injuries to personnel.

Если вы хотите узнать больше о других наших продуктах, нажмите на ссылку ниже, чтобы посетить наш официальный сайт.
ru_RURussian