¿Qué más hay que tener en cuenta, además de la protección contra la lluvia, cuando se utiliza una perforadora sacanúcleos bajo la lluvia?

Core risks in rainy operation: equipment instability from slippery ground, electrical faults due to water, borehole collapse, personnel slips. Implement strict controls in 6 core aspects per industry standards, with the core principle of avoiding rainy operation unless for urgent exploration (if unavoidable, prepare a special rainproof plan, sufficient waterproof/anti-slip/insulation materials and assign dedicated safety supervisors).

1. Site Reinforcement & Drainage

Pave steel plates/gravel/sleepers on the operation surface; fit ≥0.5 ㎡ anti-slip thick sleepers under rig outriggers (fix with steel wire ropes if needed). Excavate annular drainage ditches (≥20 cm deep, ≥3° slope) around the site; build temporary cofferdams in rainstorms to prevent water/mud immersion of rig key parts and borehole mouth.

2. Equipment Waterproof & Insulation Protection

  • Electrical system: Fit waterproof covers/rain shelters for motors, distribution boxes and junction boxes; double-wrap connections with waterproof insulating tape; ensure grounding resistance ≤4 Ω; no switch operation with wet hands.
  • Hydraulic/power system: Seal oil tanks, fit waterproof filters on air vents; inspect pipeline joint sealing and replace leaking rings timely.
  • Drilling tools & borehole mouth: Install rain shields at the borehole mouth; apply waterproof thread compound to drill pipe threads; wipe drill bits dry for rust prevention after use.

3. Drilling Parameter Adjustment

Reduce rotational speed by 20%-30% and feeding pressure during hole opening; deepen guide hole to 0.8-1 m. Increase mud viscosity and reduce water loss (add wall protection agent if slag return is abnormal). Shorten single drilling round trip by 30% and increase coring frequency.

4. Standardized Operation

Operators wear anti-slip/anti-crush rain boots, waterproof insulating gloves and split raincoats; lay anti-slip mats and set warning signs on-site. Use auxiliary clamps and torque wrenches for drill pipe connection/disassembly. Clarify commands for multi-person coordination; no staying in rig rotation radius; assign extra monitors in poor visibility. No on-site maintenance in rain; handle minor faults in rain shelters after power cut and reseal components.

5. Real-time Inspection & Emergency Response

Inspect electrical insulation, hydraulic oil quality, outrigger fixation and borehole water accumulation every 30 minutes; stop the machine and record abnormalities immediately. Stop operation, cut off power, lift drilling tools above the borehole mouth and evacuate personnel in extreme weather (thunder/≥6 grade winds/rainstorms). For waterlogged electrical components: power off, wipe dry, cold-air dry and restart only after qualified insulation test. For borehole collapse/drill sticking: no forced pulling/rotating; remove slag first, then move drilling tools at low parameters (use casing milling/left-hand thread tools if ineffective).

6. Post-operation Moisture & Rust Prevention

Move the rig to a dry, ventilated place; wipe water/mud off equipment, drilling tools and pipelines. Place desiccants in electrical components; inspect and replace emulsified hydraulic oil timely. Clean, wipe dry, coat with anti-rust oil and store drilling tools/bits by category; seal the borehole mouth with a waterproof cover and set protective signs.
Si desea obtener más información sobre nuestros otros productos, haga clic en el siguiente enlace para visitar nuestro sitio web oficial.

Otros sitios web

Plataforma de perforación
batería de litio
Cargadores aéreos
Palas cargadoras
MineríaLocomotora eléctrica (completa web)
MineríaLocomotora eléctrica (completa web)

Síguenos

Siga nuestro canal de YouTube

es_ECSpanish