Precauciones para el transporte y mantenimiento de equipos de perforación de pozos de agua

Durante el transporte, montaje, desmontaje y mantenimiento de equipos de perforación de pozos de agua, safety regulations must be strictly followed to prevent malfunctions.

Precautions for the Transportation of Water Well Drilling Rigs

When moving the water well drilling rig, balance the center of gravity according to road conditions and the site. Random drilling is prohibited at the construction site. Backfilled pits must be marked. When traveling on narrow or dangerous roads, lower the mast and retract the crawler tracks. On sloped terrain, adjust the mast’s tilt angle and lateral inclination. Adjust the rig’s center of gravity by rotating the vehicle. If the access road or construction site is flooded, use the drill bit to guide the machine.

Precautions for the Maintenance of Water Well Drilling Rigs

During the maintenance of water well drilling rigs: cool down the rig beforehand to avoid scalds from high temperatures. Relieve pressure in the hydraulic system prior to maintenance to prevent hazards caused by internal high pressure. Strictly prohibit repairing the main drum’s braking system while the main drum is loaded. When disassembling the right-hand non-rotating steel wire rope and its connection to the hoisting device, beware of mechanical rotation injuries. If the rig’s hoisting device is inflexible, causing live steel wire ropes to twist due to rotational force, avoid pinching injuries to personnel.

Si desea obtener más información sobre nuestros otros productos, haga clic en el siguiente enlace para visitar nuestro sitio web oficial.
es_ECSpanish